Difference between revisions of "UCSD-2019: Technical Working Group: Readout"

From CMB-S4 wiki
Jump to navigationJump to search
Line 8: Line 8:
 
#Lay out a timeline and process for making each decision, consistent with the post-decision work and internal reviews that will be needed to complete preparations for CD-1,
 
#Lay out a timeline and process for making each decision, consistent with the post-decision work and internal reviews that will be needed to complete preparations for CD-1,
 
#Ensure that those timelines and processes are understood and supported by the collaboration, and that we (together) believe we can follow them.
 
#Ensure that those timelines and processes are understood and supported by the collaboration, and that we (together) believe we can follow them.
 +
 +
 +
CD-1 Driver for Readout: Conceptual Design <br>
 +
Major Decisions: TDM vs FDM vs uMux
  
 
== Agenda ==
 
== Agenda ==

Revision as of 20:38, 11 October 2019

Link back to agenda

Charge

We need to use the October collaboration meeting to advance our preparations for CD-1. We need to:

  1. Identify key decisions that must be made (and justified) prior to CD-1,
  2. Make progress on (or actually make) those decisions,
  3. Lay out a timeline and process for making each decision, consistent with the post-decision work and internal reviews that will be needed to complete preparations for CD-1,
  4. Ensure that those timelines and processes are understood and supported by the collaboration, and that we (together) believe we can follow them.


CD-1 Driver for Readout: Conceptual Design
Major Decisions: TDM vs FDM vs uMux

Agenda

Template Slides With Questions Charged to Each Group: [1]

  • Technology 1 presentation (20 min)
  • Technology 2 presentation (20 min)
  • Technology 2 presentation (20 min)
  • Discussion (30 min)
  • Moving towards down-select: Timeline & Process (15 min, L2s)
  • Discussion (15 min)

Remote attendance

Zoom link

Notes