Difference between revisions of "UCSD-2019: Technical Working Group: Modules & Testing"

From CMB-S4 wiki
Jump to navigationJump to search
Line 8: Line 8:
  
 
== Agenda (2 hours total) ==
 
== Agenda (2 hours total) ==
# Overview and Phase 2 Task Report (Brad B, 30-min)
+
# Overview and Phase 2 Task Report (Brad B, 30-min) [https://docs.google.com/presentation/d/1RC3qX1Npken3okeRGwyJQOb53Sa9dSxxORKFyPE_Iac/edit?usp=sharing slides]
 
## Focus on recommended detector R&D testing plan  
 
## Focus on recommended detector R&D testing plan  
 
## Challenges of supporting multiple readout technologies
 
## Challenges of supporting multiple readout technologies

Revision as of 13:27, 18 October 2019

Link back to agenda

Charge

  1. Identify key decisions that must be made (and justified) prior to CD-1,
  2. Make progress on (or actually make) those decisions,
  3. Lay out a timeline and process for making each decision, consistent with the post-decision work and internal reviews that will be needed to complete preparations for CD-1,
  4. Ensure that those timelines and processes are understood and supported by the collaboration, and that we (together) believe we can follow them.

Agenda (2 hours total)

  1. Overview and Phase 2 Task Report (Brad B, 30-min) slides
    1. Focus on recommended detector R&D testing plan
    2. Challenges of supporting multiple readout technologies
    3. Timeline for R&D testing support
  2. Module and wiring overview for three readout technologies (45-min total)
    1. Overview of module design elements for each technology; interfaces within module, interfaces to module (in particular wiring), challenges to scalability to S4
    2. tMUX (TBD, 15-min)
    3. fMUX (Toki S., 15-min) start slide 16: [[1]]
    4. uMUX (TBD, 15-min)
  3. Module R&D (Adam A, 15-min) File:20191016 s4 sandiego modules rd.pdf
    1. Description of current module R&D activities, additional module R&D activities between now and CD-1
  4. Discussion (All, 30-min)
    1. Whiteboard discussion of perceived decisions that need to be made by CD1 (April 2021)
    2. What module R&D do we need to do between now and CD1?
    3. What detector testing do we need to support for detector development efforts
    4. Implementing a detector R&D testing plan; cryostat requirements, availability, needed input, etc.

Notes

Remote attendance

Zoom link

Notes