Difference between revisions of "UCSD-2019: Technical Working Group: Data Management"
From CMB-S4 wiki
Jump to navigationJump to search (→Notes) |
(→Notes) |
||
Line 46: | Line 46: | ||
Is there a document stating "at stage X in DOE/NSF project maturity, we need set Y of simulations"? (SH) | Is there a document stating "at stage X in DOE/NSF project maturity, we need set Y of simulations"? (SH) | ||
* No. There probably should be. | * No. There probably should be. | ||
+ | ** A worry about asking AWGs what is needed is that they will say "everything," which is hard. (KH) |
Revision as of 16:01, 17 October 2019
Contents
Charge
- Identify key decisions that must be made (and justified) prior to CD-1/PDR,
- Make progress on (or actually make) those decisions,
- Lay out a timeline and process for making each decision, consistent with the post-decision work and internal reviews that will be needed to complete preparations for CD-1/PDR,
- Ensure that those timelines and processes are understood and supported by the collaboration, and that we (together) believe we can follow them.
Agenda
- L2 Overview (Julian Borrill/Tom Crawford) slides
- Subsystem Management (Julian Borrill) slides
- Data Movement (Sasha Rahlin) slides
- Software Infrastructure (Ted Kisner) slides
- Data Synthesis (Sara Simon/Andrea Zonca) slides
- Data Reduction (Colin Bischoff/Reijo Keskitalo) slides
- Transients (Don Petravik/Nathan Whitehorn) slides (note conflict with Transients parallel)
- Site Hardware (Tom Crawford) slides
- Simulations for Flowdown (Sara Simon) slides
Remote attendance
Notes
Big questions to answer here:
- What are we missing?
Note that the L2-level stuff, including the bi-weekly telecon, is all coordination and management; real work is done at L3 and below.
DM scope redefined as raw data coming off the telescopes to well-characterized "reduced data (maps, etc.)." (Used to be "well-characterized maps" but transients...)
- also responsible for mock data sets to support decisions in other WBSs.
DM transitions to operations in ~2026
- but there's a data challenge scheduled for 2027, should we change that? (MEM)
- maybe say DM "begins transition" to ops in 2026.
Discussion about boundary between roles of project DM (raw data to maps) and collaboration analyzers (maps to science).
What does "well-characterized" mean? (RS)
- Something we probably need to define better, along with analysis working groups.
Is there a document stating "at stage X in DOE/NSF project maturity, we need set Y of simulations"? (SH)
- No. There probably should be.
- A worry about asking AWGs what is needed is that they will say "everything," which is hard. (KH)