Difference between revisions of "UCSD-2019: Cross-Cut: Site Resource Requirements"

From CMB-S4 wiki
Jump to navigationJump to search
Line 12: Line 12:
 
*LAT site requirements (10 min, Vic Gaurino)
 
*LAT site requirements (10 min, Vic Gaurino)
 
*SAT site requirements (10 min)
 
*SAT site requirements (10 min)
*Data Management site requirements (10 min, Tom Crawford)
+
*Data Management site requirements (10 min, Tom Crawford) [https://docs.google.com/presentation/d/1Xb6E1QXDzjEmW5oYr6sxEag_lmElsHEnxIBXLJRuHQs slides]
 
*Other inputs (as needed)
 
*Other inputs (as needed)
 
*Discussion (determine path forward to CD1)
 
*Discussion (determine path forward to CD1)

Revision as of 09:40, 15 October 2019

Link back to agenda

Charge

  • Survey all needed resources on-site: power, cooling, communication, space (and requirements on the space), distance between telescopes, etc.
  • Define for each site, depending on number of telescopes / number of tubes for each site

Agenda

  • Overview (10 min, Kam Arnold)
  • LAT site requirements (10 min, Vic Gaurino)
  • SAT site requirements (10 min)
  • Data Management site requirements (10 min, Tom Crawford) slides
  • Other inputs (as needed)
  • Discussion (determine path forward to CD1)

Remote attendance

Zoom link

Notes