Difference between revisions of "UCSD-2019: Cross-Cut: Site Resource Requirements"

From CMB-S4 wiki
Jump to navigationJump to search
 
Line 13: Line 13:
 
*SAT site requirements (10 min)
 
*SAT site requirements (10 min)
 
*Data Management site requirements (10 min, Tom Crawford) [https://docs.google.com/presentation/d/1Xb6E1QXDzjEmW5oYr6sxEag_lmElsHEnxIBXLJRuHQs slides]
 
*Data Management site requirements (10 min, Tom Crawford) [https://docs.google.com/presentation/d/1Xb6E1QXDzjEmW5oYr6sxEag_lmElsHEnxIBXLJRuHQs slides]
 +
*DAQ site requirements (5 min, Nathan Whitehorn) [[File:DAQ-Site-Requirements-10-18-2019.pdf | slides]]
 
*Other inputs (as needed)
 
*Other inputs (as needed)
 
*Discussion (determine path forward to CD1)
 
*Discussion (determine path forward to CD1)

Latest revision as of 15:03, 18 October 2019

Link back to agenda

Charge

  • Survey all needed resources on-site: power, cooling, communication, space (and requirements on the space), distance between telescopes, etc.
  • Define for each site, depending on number of telescopes / number of tubes for each site

Agenda

Remote attendance

Notes