UCSD-2019: Analysis/Pipeline Working Group: Low-ell BB
From CMB-S4 wiki
Jump to navigationJump to searchCharge
- Identify key decisions that must be made (and justified) prior to CD-1,
- Make progress on (or actually make) those decisions,
- Lay out a timeline and process for making each decision, consistent with the post-decision work and internal reviews that will be needed to complete preparations for CD-1,
- Ensure that those timelines and processes are understood and supported by the collaboration, and that we (together) believe we can follow them.
Key Issues
- How do we optimize detector allocation across frequency in the face of uncertainty about foreground properties, for both the SATs and the delensing LAT?
- What are the advantages of split bands? How does performance compare to non-split bands?
- Do we need a 20 GHz channel on delensing LAT (for SAT science)
- How well will de-lensing work in practice?
- What are the necessary analysis tools to answer these questions?
What is CD-1?
Blatantly copied from Analysis/Pipeline Working Group: Maps to C_ell:
Background/clarifying questions:
- What does “by CD-1” mean, and what are the implications for when tools need to be in place and working?
- According to APC white paper (https://arxiv.org/abs/1908.01062), CD-1 is in Q3 of FY2021 (so June 2021?).
- But according to project office, "Plan [must be] finalized by start of 2020 for delivering...CD-1"
- Working backward from there, any tool that could reasonably influence a CD-1 decision needs to be in place and working by ... ?
- Give an example timeline for an example decision?
- According to APC white paper (https://arxiv.org/abs/1908.01062), CD-1 is in Q3 of FY2021 (so June 2021?).
Agenda
- Introduction by everyone in the room: who? where? what aspects of low-ell BB interest you? 5 minutes
- Recap of the plan for this session/CD-1 goals slides[Wu], 3 minutes
- Review of Fisher based S4 forecasting thus far leading to DSR appendix A [Ben/Victor/Raphael], 15 minutes
- Review of Map based S4 forecasting thus far and ideas for next steps Clem, 10 minutes
- Review of forecasting and simulations for Simons Observatory inflation science [Alonso / Errard / Sherwin], slides 30 minutes
- Plans for working group [all], ~60 minutes
- Forecasting
- Quantitative comparison of SO and CMB-S4 DSR forecasts
- Optimization of delensing effort: update for DSR sensitivity, motivation for frequency coverage, feedback from real delensing efforts
- Data Challenge simulations
- More / better foreground models
- Instrumental systematics
- Other map non-idealities, i.e. filtering / mode loss
- Coordination with technical groups on instrument configuration, etc
- What else needs to be demonstrated for CD1?
- Bottlenecks for sim production
- Analysis of Data Challenges
- Who plans to participate? How do we get more participation?
- Delensing
- Specific Data Challenge plan / timeline
- Experiment config 06: DSR configuration, in progress
- Update / reoptimization of delensing survey?
- Inclusion of instrumental systematics -- which ones? how to include?
- Data Challenges coming out of Data Management group
- Forecasting
Remote attendance