Search results
From CMB-S4 wiki
Jump to navigationJump to searchCreate the page "Ruhl" on this wiki! See also the search results found.
- Moderator: John Ruhl109 bytes (16 words) - 12:58, 21 October 2016
- * John Ruhl (Chair)285 bytes (38 words) - 23:22, 5 September 2018
- * John Ruhl (Membership Committee Chair)362 bytes (47 words) - 19:39, 24 August 2020
- *Senior membership criterion for project personnel (Ruhl, 15 min)289 bytes (39 words) - 13:42, 19 November 2019
- * Membership Committee report (Ruhl, 20 min)350 bytes (42 words) - 04:41, 22 January 2019
- ...mittee update on membership policies and summary of annual reporting (John Ruhl, 15 min)473 bytes (62 words) - 11:30, 13 April 2020
- *Membership committee report (Ruhl, 10 min)529 bytes (67 words) - 19:09, 26 May 2019
- chairs: Kam Arnold (Chile), John Ruhl (South Pole) co-chairs:Kam Arnold, John Ruhl2 KB (320 words) - 16:45, 30 January 2020
- ...ession P3-1: Status of reference design overview from P1 and P2 (chair: J. Ruhl) == * Ruhl: Did you discuss multiple telescopes per mount for small aperture? Nils: N4 KB (621 words) - 15:45, 6 March 2018
- Moderator: John Ruhl953 bytes (124 words) - 12:47, 21 October 2016
- *John Ruhl (Case Western)752 bytes (100 words) - 09:49, 6 October 2017
- * South Pole site plan (Ruhl)1 KB (156 words) - 13:14, 1 April 2020
- ...determining detector specifications and flowdown (TBC: Jeff McMahon / John Ruhl, 20-min) ...ress on determine readout specifications and flowdown (Jeff McMahon / John Ruhl, 15 min) [[File:ReadoutFlowdown_JR.key | keynote]] [[File:ReadoutFlowdown_3 KB (433 words) - 14:41, 31 March 2020
- Q. Ruhl. Looks like some lower freq bands might need trichroic pixels. A. 20GHz de Q. Ruhl. What if we cannot reach consensus because of process, not lack of informat7 KB (1,083 words) - 18:59, 5 March 2018
- ...ll the other science too. CDT required the new science to be cost neutral. Ruhl doesn't want to spin his wheels on a reference design if we are going to ch7 KB (1,199 words) - 16:55, 5 March 2018
- ** Add tab to John Ruhl's spreadsheet & require login to edit2 KB (300 words) - 09:58, 7 March 2018
- Ruhl: in SPT-3G, using all bond pad space around perimeter. 1500 detectors on a Ruhl: at some point our thinking about configurations will be constrained by cos8 KB (1,281 words) - 12:16, 21 October 2016
- ...tions to the chair of the membership committee, [mailto:ruhl@case.edu John Ruhl]. | Gullett || Ian || Student || John Ruhl || Case Western Reserve University16 KB (1,840 words) - 12:30, 8 December 2020
- * Membership [Neelima Sehgal and John Ruhl] (20 min) [https://docs.google.com/presentation/d/1euZsiGarraaS7kIM8AQAfsS ...-1 Status of reference design overview from P1 and P2]] [Coordinator: John Ruhl] -- Auditorium17 KB (2,475 words) - 09:37, 15 March 2018
- * '''09:45''' Membership (John Ruhl) [https://docs.google.com/presentation/d/1_OzqTXBoGqSZn2BYjpDAt0gx6ZLfKaxGy * '''2:50''' SAT siting decision tree (John Ruhl) [https://docs.google.com/presentation/d/1NL06LQ2te-bo3LF350T9Lf2D8lTcWqV_A9 KB (1,332 words) - 15:03, 15 March 2019