Difference between revisions of "Requirements Flowdown"
Nwhitehorn (talk | contribs) |
|||
Line 24: | Line 24: | ||
* Link to Legacy Survey: Mass Mapping flowdown wiki to be placed here. [https://docs.google.com/document/d/1-duNRqdsYLABtVh_Alx-tFPaNQL3PySbonj0UN4CD94/edit?usp=sharing Draft page here.] | * Link to Legacy Survey: Mass Mapping flowdown wiki to be placed here. [https://docs.google.com/document/d/1-duNRqdsYLABtVh_Alx-tFPaNQL3PySbonj0UN4CD94/edit?usp=sharing Draft page here.] | ||
* Link to Legacy Survey: Baryon Mapping flowdown wiki to be placed here. [https://docs.google.com/document/d/1yi1GNXpk_-rZXQLflZNvQc9BRupbw3F7O-oFtZWibzQ/edit?usp=sharing Draft page here.] | * Link to Legacy Survey: Baryon Mapping flowdown wiki to be placed here. [https://docs.google.com/document/d/1yi1GNXpk_-rZXQLflZNvQc9BRupbw3F7O-oFtZWibzQ/edit?usp=sharing Draft page here.] | ||
− | * Link to Legacy Survey: Time Domain flowdown wiki to be placed here | + | * Link to Legacy Survey: Time Domain flowdown wiki to be placed here [[Transients]] |
===Reference documents=== | ===Reference documents=== | ||
* CDT Science traceability matrix [[file:CDT_STM.pdf]] | * CDT Science traceability matrix [[file:CDT_STM.pdf]] | ||
* DESI requirements tracker and SRD [[File:DESI_L123_driver.pdf]] | * DESI requirements tracker and SRD [[File:DESI_L123_driver.pdf]] |
Revision as of 13:41, 7 March 2019
This page tracks work towards refining the links and traceability between Science requirements, measurement requirements and system/instrument requirements. The immediate goal is to converge on a Science Traceability Matrix (see CDT STM linked below for example) in time for the Decadal Survey Review in mid 2019. The STM needs to be backed by clear, crisp evidence explaining our choices in survey and instrument strategy.
Meetings
Science Collaboration Flowdown meeting (coordinated by J3)
- Membership: ET, SC, TC, Project team
- Biweekly starting Feb 11, 11am pacific/2pm eastern
- Uberconference cmbs4a
- (866-578-4799 or 480-999-2448)
- Notes for Julian's flowdown call
Project Flowdown Assessment working group (coordinated by Natalie and Zeesh)
- Membership: Darcy Barron, Chris Sheehy, Chris Bebek, Nadine Kurita, Martin Nordby, Natalie Roe, Zeesh Ahmed
- Searching for a new meeting time..
- Notes for project system engineering
Materials
As a first step, we will use the following spreadsheet to make sure we have links to basis documentation backing the various requirements that the collaboration has already identified. This tool will also help us identify holes in the flowdown that need to be filled.
- CMB-S4 requirements traceability spreadsheet
- Elements of Flowdown to be completed before FNAL meeting
- Link to PGW flowdown notes
- Link to Neff flowdown notes
- Link to Legacy Survey: Mass Mapping flowdown wiki to be placed here. Draft page here.
- Link to Legacy Survey: Baryon Mapping flowdown wiki to be placed here. Draft page here.
- Link to Legacy Survey: Time Domain flowdown wiki to be placed here Transients
Reference documents
- CDT Science traceability matrix File:CDT STM.pdf
- DESI requirements tracker and SRD File:DESI L123 driver.pdf