LBNL-2020: Testing Facilities

From CMB-S4 wiki
Revision as of 15:37, 19 March 2020 by Bbenson (talk | contribs)
Jump to navigationJump to search

Charge

  • Present an overall testing plan
    • 1st, for 2020/2021 prototype wafers,
    • Longer term plans (should include optics tube testing)
    • Are any setups doing both readout and detector testing, or is it going to be all separate? Present/develop plan for getting enough capacity, and uniformity/consistency of testing setups.
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Notes