Line 30: Line 30:
 
** Lessons learned from SO.
 
** Lessons learned from SO.
  
* Long-term testing plan through production (Brad Benson: 20-min)
+
* Long-term testing plan through production (Brad Benson: 20-min) [https://docs.google.com/presentation/d/1EmhyRiz9cScoy-1phlrLCKfp419uRCgjTcbkbjftuoM/edit?usp=sharing]
 
** Prototype detector testbeds
 
** Prototype detector testbeds
 
** Optics tube testers: Dedicated LAT optics tube testers (example: [https://docs.google.com/presentation/d/11yJtpuezHVrAxSxML2Wq-Z3lX9UzYFsMsgLAmnd36PM/edit#slide=id.g728287bcf5_0_0 CCAT module tester]), SAT cryostats
 
** Optics tube testers: Dedicated LAT optics tube testers (example: [https://docs.google.com/presentation/d/11yJtpuezHVrAxSxML2Wq-Z3lX9UzYFsMsgLAmnd36PM/edit#slide=id.g728287bcf5_0_0 CCAT module tester]), SAT cryostats

Latest revision as of 10:36, 1 April 2020

Link back to main meeting page:

Zoom link for Wednesday: https://lbnl.zoom.us/j/998919980

Charge

  • Present an overall testing plan
    • 1st, for 2020/2021 prototype wafers,
    • Longer term plans (should include optics tube testing)
    • Are any setups doing both readout and detector testing, or is it going to be all separate? Present/develop plan for getting enough capacity, and uniformity/consistency of testing setups.
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

  • R&D and Prototype Testbeds (Brad Benson: 10-min) [2]
    • Testbed plan, scope, and schedule
    • Relationship with readout down-select
    • Test equipment needs: cold-loads, choppers, lenses, etc.
  • Optics Tube Testing (Katie Harrington: 15-min) [3]
    • Optics tube testing needs.
    • Balance of warm and cold testings.
    • Integrated testing with detectors.
    • Lessons learned from SO.
  • Long-term testing plan through production (Brad Benson: 20-min) [4]
    • Prototype detector testbeds
    • Optics tube testers: Dedicated LAT optics tube testers (example: CCAT module tester), SAT cryostats
    • Production test cryostats
    • Test equipment needs
    • Coordination with readout testbeds
    • Plan ahead of August Review and ahead of CD-1

Notes