== Charge ==
 
== Charge ==
 +
 +
* Present an overall testing plan
 +
** 1st, for 2020/2021 prototype wafers,
 +
** Longer term plans (should include optics tube testing)
 +
** Are any setups doing both readout and detector testing, or is it going to be all separate?  Present/develop plan for getting enough capacity, and uniformity/consistency of testing setups.
 +
* Plan schedule of design reviews for these subsystems needed before CD1
  
 
== Agenda ==
 
== Agenda ==
  
 
== Notes ==
 
== Notes ==

Revision as of 15:37, 19 March 2020

Charge

  • Present an overall testing plan
    • 1st, for 2020/2021 prototype wafers,
    • Longer term plans (should include optics tube testing)
    • Are any setups doing both readout and detector testing, or is it going to be all separate? Present/develop plan for getting enough capacity, and uniformity/consistency of testing setups.
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Notes