Difference between revisions of "LBNL-2020: Testing Facilities"
From CMB-S4 wiki
Jump to navigationJump to search(8 intermediate revisions by 4 users not shown) | |||
Line 3: | Line 3: | ||
* [[LBNL-2020: Cosmology with CMB-S4]] | * [[LBNL-2020: Cosmology with CMB-S4]] | ||
− | Zoom link: https://lbnl.zoom.us/j/ | + | Zoom link for Wednesday: https://lbnl.zoom.us/j/998919980 |
== Charge == | == Charge == | ||
Line 15: | Line 15: | ||
== Agenda == | == Agenda == | ||
− | * CDFG R&D Testing: (TBC: Adam Anderson: 10-min) | + | * CDFG R&D Testing: (TBC: Adam Anderson: 10-min) [[File:20200401_anderson_cdfg_rd_testing.pdf]] |
** Requirements and scope of testing needed. | ** Requirements and scope of testing needed. | ||
− | ** Testing requirements: | + | ** CDFG Testing requirements: [https://docs.google.com/document/d/1n9Wdjds6iPtWdnnmdQNeIaI80c8aMzTKvlcmMpWvvjI/edit?usp=sharing] |
− | https://docs.google.com/document/d/1n9Wdjds6iPtWdnnmdQNeIaI80c8aMzTKvlcmMpWvvjI/edit?usp=sharing | ||
− | * R&D and Prototype Testbeds (Brad Benson: | + | * R&D and Prototype Testbeds (Brad Benson: 10-min) [https://docs.google.com/presentation/d/1z2FrWcnouCqXKlA06voRVZqv7Lrjz9wRitgyia9Y-qs/edit?usp=sharing] |
** Testbed plan, scope, and schedule | ** Testbed plan, scope, and schedule | ||
** Relationship with readout down-select | ** Relationship with readout down-select | ||
− | ** Test equipment needs: cold-loads, choppers, lenses, | + | ** Test equipment needs: cold-loads, choppers, lenses, etc. |
− | * Optics Tube Testing (Katie Harrington: 15-min) | + | * Optics Tube Testing (Katie Harrington: 15-min) [https://docs.google.com/presentation/d/1431Kt5CcRtOfLezgS6Pgtim1RtuDYUnSjxYE6vEiFY0/edit] |
** Optics tube testing needs. | ** Optics tube testing needs. | ||
** Balance of warm and cold testings. | ** Balance of warm and cold testings. | ||
Line 31: | Line 30: | ||
** Lessons learned from SO. | ** Lessons learned from SO. | ||
− | * Long-term testing plan through production (Brad Benson: 20-min) | + | * Long-term testing plan through production (Brad Benson: 20-min) [https://docs.google.com/presentation/d/1EmhyRiz9cScoy-1phlrLCKfp419uRCgjTcbkbjftuoM/edit?usp=sharing] |
** Prototype detector testbeds | ** Prototype detector testbeds | ||
− | ** Optics tube testers: Dedicated LAT optics tube testers, SAT cryostats | + | ** Optics tube testers: Dedicated LAT optics tube testers (example: [https://docs.google.com/presentation/d/11yJtpuezHVrAxSxML2Wq-Z3lX9UzYFsMsgLAmnd36PM/edit#slide=id.g728287bcf5_0_0 CCAT module tester]), SAT cryostats |
** Production test cryostats | ** Production test cryostats | ||
** Test equipment needs | ** Test equipment needs | ||
+ | ** Coordination with readout testbeds | ||
** Plan ahead of August Review and ahead of CD-1 | ** Plan ahead of August Review and ahead of CD-1 | ||
Latest revision as of 10:36, 1 April 2020
Link back to main meeting page:
Zoom link for Wednesday: https://lbnl.zoom.us/j/998919980
Charge
- Present an overall testing plan
- 1st, for 2020/2021 prototype wafers,
- Longer term plans (should include optics tube testing)
- Are any setups doing both readout and detector testing, or is it going to be all separate? Present/develop plan for getting enough capacity, and uniformity/consistency of testing setups.
- Plan schedule of design reviews for these subsystems needed before CD1
Agenda
- CDFG R&D Testing: (TBC: Adam Anderson: 10-min) File:20200401 anderson cdfg rd testing.pdf
- Requirements and scope of testing needed.
- CDFG Testing requirements: [1]
- R&D and Prototype Testbeds (Brad Benson: 10-min) [2]
- Testbed plan, scope, and schedule
- Relationship with readout down-select
- Test equipment needs: cold-loads, choppers, lenses, etc.
- Optics Tube Testing (Katie Harrington: 15-min) [3]
- Optics tube testing needs.
- Balance of warm and cold testings.
- Integrated testing with detectors.
- Lessons learned from SO.
- Long-term testing plan through production (Brad Benson: 20-min) [4]
- Prototype detector testbeds
- Optics tube testers: Dedicated LAT optics tube testers (example: CCAT module tester), SAT cryostats
- Production test cryostats
- Test equipment needs
- Coordination with readout testbeds
- Plan ahead of August Review and ahead of CD-1
Notes
https://docs.google.com/document/d/1spg9OyGyyx7FBVgSBRuSI-O2Ns_ayYIol8yr9Iltfqo/edit?usp=sharing