Difference between revisions of "LBNL-2020: Telescope Interfaces: Sites and I&C"
From CMB-S4 wiki
Jump to navigationJump to search (Created page with "== Charge == == Agenda == == Notes ==") |
(→Charge) |
||
Line 1: | Line 1: | ||
== Charge == | == Charge == | ||
+ | |||
+ | General guidance: | ||
+ | “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.” | ||
+ | * Review the upcoming milestones, review, advisory committee formation etc. | ||
+ | * What are the most urgent tasks/decisions to get collaboration input, where do you need help? | ||
+ | * Plan schedule of design reviews needed before CD-1 | ||
+ | |||
+ | Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete. | ||
+ | * Lay out N. American + Chile/Pole I&T plan | ||
+ | * Includes common staffing plan | ||
+ | * Includes test hardware requirements, sharing plan | ||
+ | * Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan | ||
+ | * Plan schedule of design reviews for these subsystems needed before CD1 | ||
== Agenda == | == Agenda == | ||
== Notes == | == Notes == |
Revision as of 19:02, 24 March 2020
Charge
General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”
* Review the upcoming milestones, review, advisory committee formation etc. * What are the most urgent tasks/decisions to get collaboration input, where do you need help? * Plan schedule of design reviews needed before CD-1
Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.
* Lay out N. American + Chile/Pole I&T plan * Includes common staffing plan * Includes test hardware requirements, sharing plan * Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan * Plan schedule of design reviews for these subsystems needed before CD1