Difference between revisions of "LBNL-2020: Telescope Interfaces: Sites and I&C"

From CMB-S4 wiki
Jump to navigationJump to search
(Created page with "== Charge == == Agenda == == Notes ==")
 
 
(18 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
== Charge ==
 
== Charge ==
 +
 +
General guidance:
 +
“The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”
 +
* Review the upcoming milestones, review, advisory committee formation etc.
 +
* What are the most urgent tasks/decisions to get collaboration input, where do you need help?
 +
* Plan schedule of design reviews needed before CD-1
 +
 +
Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.
 +
* Lay out N. American + Chile/Pole I&T plan
 +
** Includes common staffing plan
 +
** Includes test hardware requirements, sharing plan
 +
* Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
 +
* Plan schedule of design reviews for these subsystems needed before CD1
  
 
== Agenda ==
 
== Agenda ==
 +
 +
ZOOM CONNECTION FOR WEDNESDAY: https://lbnl.zoom.us/j/177357834
 +
 +
[https://docs.google.com/document/d/1tfkgLuPG063TCZmPJ33rErZuLVzKML1G1_ImqvCkgtQ/edit?usp=sharing Realtime Notes]
 +
 +
* Quick Introduction/Summary of Site requirements in DSR:
 +
** Reminder of slides from UCSD: [https://docs.google.com/presentation/d/1p3lDcxpY_ZnveHSzvy-DTQgxPRDxpdA7glk6H_DateQ/edit?usp=sharing slides]
 +
** At UCSD we said in 2020-03 we would get collaboration input (CCATp, SO) and in 2020-05 we would get a SAT siting plan. Progress on these?
 +
** Updated info that went into RFI: https://docs.google.com/presentation/d/1RRVplavnxqME6yH3wh80P42WWg-CUgM9EP_8WCWyrFQ/edit?usp=sharing slides]
 +
* Review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work [https://docs.google.com/spreadsheets/d/11vKtmXvEN-BNPMCTffeSbTiuZlxqoXE85Y6AbEpezsU/edit?usp=sharing]
 +
** Discuss how we staff the parallel activities.
 +
** Discuss how we can jointly plan for testing and calibration hardware.
 +
 +
* Layout requirements, Chile site layout brainstorming (Kam will share screen) [https://docs.google.com/document/d/1d0dpkgSKz_3ohWOttbP6UF8vj2O49s75vPKrkWksx74/edit?usp=sharing S4-CH-LO-001-SiteLayoutOverview]
 +
* LAT site requirements, I&C thoughts (from LAT group)
 +
* SAT site requirements, I&C thoughts (from SAT group) [https://docs.google.com/presentation/d/1LHBgqUonm7YCSQJRXF_3Etd8cX436eCfjVW5m21B9OM/edit?usp=sharing]
 +
 +
* ICDs:
 +
** Chile-LAT ICD: [https://docs.google.com/document/d/1EhxU1MIn6YOUT0dxU_SVBAh0qk3sanPdjX5E4pqloso/edit?usp=sharing S4-CH-ICD-001_Chile-LAT]
 +
** Chile-SAT ICD: [https://docs.google.com/document/d/1dxFgHs-fO7Vp6pq2VB7aFB7TXtnHpaY-kVwfR7cq4pg/edit?usp=sharing S4-CH-ICD-002_Chile-SAT]
 +
** Chile-DM ICD: [https://docs.google.com/document/d/1ncX0XBfti8hf6VxHzRdFY2psgwbBw19lnUG7Wr5iHk4/edit?usp=sharing S4-CH-ICD-003_Chile-DM]
 +
** Chile-DAC ICD: [https://docs.google.com/document/d/1okIRlNtmcfYgRc8SeLGKzxvI0CXirg6iMouaCAcyLRY/edit?usp=sharing S4-CH-ICD-004_Chile-DAC]
 +
 +
 +
* Discussion
  
 
== Notes ==
 
== Notes ==

Latest revision as of 11:01, 1 April 2020

Charge

General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”

  • Review the upcoming milestones, review, advisory committee formation etc.
  • What are the most urgent tasks/decisions to get collaboration input, where do you need help?
  • Plan schedule of design reviews needed before CD-1

Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.

  • Lay out N. American + Chile/Pole I&T plan
    • Includes common staffing plan
    • Includes test hardware requirements, sharing plan
  • Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

ZOOM CONNECTION FOR WEDNESDAY: https://lbnl.zoom.us/j/177357834

Realtime Notes

  • Quick Introduction/Summary of Site requirements in DSR:
  • Review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work [1]
    • Discuss how we staff the parallel activities.
    • Discuss how we can jointly plan for testing and calibration hardware.
  • Layout requirements, Chile site layout brainstorming (Kam will share screen) S4-CH-LO-001-SiteLayoutOverview
  • LAT site requirements, I&C thoughts (from LAT group)
  • SAT site requirements, I&C thoughts (from SAT group) [2]


  • Discussion

Notes