Difference between revisions of "LBNL-2020: Telescope Interfaces: Sites and I&C"
From CMB-S4 wiki
Jump to navigationJump to search (Created page with "== Charge == == Agenda == == Notes ==") |
(→Agenda) |
||
(18 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
== Charge == | == Charge == | ||
+ | |||
+ | General guidance: | ||
+ | “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.” | ||
+ | * Review the upcoming milestones, review, advisory committee formation etc. | ||
+ | * What are the most urgent tasks/decisions to get collaboration input, where do you need help? | ||
+ | * Plan schedule of design reviews needed before CD-1 | ||
+ | |||
+ | Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete. | ||
+ | * Lay out N. American + Chile/Pole I&T plan | ||
+ | ** Includes common staffing plan | ||
+ | ** Includes test hardware requirements, sharing plan | ||
+ | * Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan | ||
+ | * Plan schedule of design reviews for these subsystems needed before CD1 | ||
== Agenda == | == Agenda == | ||
+ | |||
+ | ZOOM CONNECTION FOR WEDNESDAY: https://lbnl.zoom.us/j/177357834 | ||
+ | |||
+ | [https://docs.google.com/document/d/1tfkgLuPG063TCZmPJ33rErZuLVzKML1G1_ImqvCkgtQ/edit?usp=sharing Realtime Notes] | ||
+ | |||
+ | * Quick Introduction/Summary of Site requirements in DSR: | ||
+ | ** Reminder of slides from UCSD: [https://docs.google.com/presentation/d/1p3lDcxpY_ZnveHSzvy-DTQgxPRDxpdA7glk6H_DateQ/edit?usp=sharing slides] | ||
+ | ** At UCSD we said in 2020-03 we would get collaboration input (CCATp, SO) and in 2020-05 we would get a SAT siting plan. Progress on these? | ||
+ | ** Updated info that went into RFI: https://docs.google.com/presentation/d/1RRVplavnxqME6yH3wh80P42WWg-CUgM9EP_8WCWyrFQ/edit?usp=sharing slides] | ||
+ | * Review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work [https://docs.google.com/spreadsheets/d/11vKtmXvEN-BNPMCTffeSbTiuZlxqoXE85Y6AbEpezsU/edit?usp=sharing] | ||
+ | ** Discuss how we staff the parallel activities. | ||
+ | ** Discuss how we can jointly plan for testing and calibration hardware. | ||
+ | |||
+ | * Layout requirements, Chile site layout brainstorming (Kam will share screen) [https://docs.google.com/document/d/1d0dpkgSKz_3ohWOttbP6UF8vj2O49s75vPKrkWksx74/edit?usp=sharing S4-CH-LO-001-SiteLayoutOverview] | ||
+ | * LAT site requirements, I&C thoughts (from LAT group) | ||
+ | * SAT site requirements, I&C thoughts (from SAT group) [https://docs.google.com/presentation/d/1LHBgqUonm7YCSQJRXF_3Etd8cX436eCfjVW5m21B9OM/edit?usp=sharing] | ||
+ | |||
+ | * ICDs: | ||
+ | ** Chile-LAT ICD: [https://docs.google.com/document/d/1EhxU1MIn6YOUT0dxU_SVBAh0qk3sanPdjX5E4pqloso/edit?usp=sharing S4-CH-ICD-001_Chile-LAT] | ||
+ | ** Chile-SAT ICD: [https://docs.google.com/document/d/1dxFgHs-fO7Vp6pq2VB7aFB7TXtnHpaY-kVwfR7cq4pg/edit?usp=sharing S4-CH-ICD-002_Chile-SAT] | ||
+ | ** Chile-DM ICD: [https://docs.google.com/document/d/1ncX0XBfti8hf6VxHzRdFY2psgwbBw19lnUG7Wr5iHk4/edit?usp=sharing S4-CH-ICD-003_Chile-DM] | ||
+ | ** Chile-DAC ICD: [https://docs.google.com/document/d/1okIRlNtmcfYgRc8SeLGKzxvI0CXirg6iMouaCAcyLRY/edit?usp=sharing S4-CH-ICD-004_Chile-DAC] | ||
+ | |||
+ | |||
+ | * Discussion | ||
== Notes == | == Notes == |
Latest revision as of 11:01, 1 April 2020
Charge
General guidance: “The primary focus of this meeting will be technical and scientific progress towards the baseline design in general and the summer agency review in particular.”
- Review the upcoming milestones, review, advisory committee formation etc.
- What are the most urgent tasks/decisions to get collaboration input, where do you need help?
- Plan schedule of design reviews needed before CD-1
Review LAT/SAT sites requirements and define/review interfaces, make sure they are complete.
- Lay out N. American + Chile/Pole I&T plan
- Includes common staffing plan
- Includes test hardware requirements, sharing plan
- Write down test plan both in N. America and Chile/Pole, or determine path to knowing that plan
- Plan schedule of design reviews for these subsystems needed before CD1
Agenda
ZOOM CONNECTION FOR WEDNESDAY: https://lbnl.zoom.us/j/177357834
- Quick Introduction/Summary of Site requirements in DSR:
- Reminder of slides from UCSD: slides
- At UCSD we said in 2020-03 we would get collaboration input (CCATp, SO) and in 2020-05 we would get a SAT siting plan. Progress on these?
- Updated info that went into RFI: https://docs.google.com/presentation/d/1RRVplavnxqME6yH3wh80P42WWg-CUgM9EP_8WCWyrFQ/edit?usp=sharing slides]
- Review of I&C schedule and resources in DSR, and how those overlap with N. America SAT/LAT work [1]
- Discuss how we staff the parallel activities.
- Discuss how we can jointly plan for testing and calibration hardware.
- Layout requirements, Chile site layout brainstorming (Kam will share screen) S4-CH-LO-001-SiteLayoutOverview
- LAT site requirements, I&C thoughts (from LAT group)
- SAT site requirements, I&C thoughts (from SAT group) [2]
- ICDs:
- Chile-LAT ICD: S4-CH-ICD-001_Chile-LAT
- Chile-SAT ICD: S4-CH-ICD-002_Chile-SAT
- Chile-DM ICD: S4-CH-ICD-003_Chile-DM
- Chile-DAC ICD: S4-CH-ICD-004_Chile-DAC
- Discussion