Difference between revisions of "LBNL-2020: SAT"

From CMB-S4 wiki
Jump to navigationJump to search
(Created page with "== Charge == == Agenda == == Notes ==")
 
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
Zoom: https://lbnl.zoom.us/j/818598127
 +
 +
Real time notes: [https://drive.google.com/open?id=1tTMJ4VRHlzzbzjCuGEZD7F4O4NpKjPSz5cbhqACi14w link], including links to slides
 +
 
== Charge ==
 
== Charge ==
 +
* Present 3-shooter/1-shooter/hybrid configuration choice / Task Force report
 +
* Determine whether any CD3a items are happening, if so what is the path to that.
 +
* Discuss other choices that need to be made, eg filter configuration, and paths toward making them.
 +
* Summarize/update technical risks, R&D / simulation / engineering needs to retire those risks.
 +
* Plan schedule of design reviews for these subsystems needed before CD1
  
 
== Agenda ==
 
== Agenda ==
 +
* Intro (Akito/John) 5min
 +
* Optics 25min
 +
** Warm baffling study report (Kirit/Fred)  20min
 +
** Optics simulations (Qi) 5min
 +
* Cryostat design work (Ben/Joe/Nick) 15min
 +
* Taskforce report (Akito/John) 45min
 +
* Toward CD1 (Akito/John/Tim/Bobby) 20min
  
 
== Notes ==
 
== Notes ==
 +
[https://docs.google.com/document/d/1tTMJ4VRHlzzbzjCuGEZD7F4O4NpKjPSz5cbhqACi14w/edit Notes google doc]

Latest revision as of 12:01, 1 April 2020

Zoom: https://lbnl.zoom.us/j/818598127

Real time notes: link, including links to slides

Charge

  • Present 3-shooter/1-shooter/hybrid configuration choice / Task Force report
  • Determine whether any CD3a items are happening, if so what is the path to that.
  • Discuss other choices that need to be made, eg filter configuration, and paths toward making them.
  • Summarize/update technical risks, R&D / simulation / engineering needs to retire those risks.
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

  • Intro (Akito/John) 5min
  • Optics 25min
    • Warm baffling study report (Kirit/Fred) 20min
    • Optics simulations (Qi) 5min
  • Cryostat design work (Ben/Joe/Nick) 15min
  • Taskforce report (Akito/John) 45min
  • Toward CD1 (Akito/John/Tim/Bobby) 20min

Notes

Notes google doc