Difference between revisions of "LBNL-2020: S2M Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
Line 23: Line 23:
 
                
 
                
 
                      
 
                      
40 min    Science Traceability Matrix --- Identification of open issues.                                    Knox, Holder, Lawrence                                 
+
40 min    Science Traceability Matrix --- [Identification of open issues[https://docs.google.com/presentation/d/1wUiKZjQUbN46zP8mgMiL4Xej9qj_sNvXyCv92Hvym4E/edit#slide=id.g82b3ea2132_0_0]].                                    Knox, Holder, Lawrence                                 
 
               Work and assignments.  Who will do what, by when?
 
               Work and assignments.  Who will do what, by when?
 
              
 
              

Revision as of 19:07, 31 March 2020

Connection Details

https://lbnl.zoom.us/j/676588242

Host - Charles Lawrence

Scribes - Lloyd Knox and Gil Holder

Charge

Discuss science requirements, their flowdown to measurements requirements, and what must be done in preparation for the August review

Agenda

30 min Roles of and relationships between STM, error budgets, requirements File:S2M flowdown CMB-S4 04-01-2020.pdf Lawrence

         STM = https://docs.google.com/spreadsheets/d/1W7NWxVfKel13Vs_3_rq0rwxlOwhzItrL/edit#gid=365126799
         Error budget = slides
         Outline of requirements document =
                 https://docs.google.com/spreadsheets/d/1EE25NskNqN5B7pOK0IPGbLkZopcRuhLDwssE1r56pkQ/edit#gid=0    

10 min Success criteria for NSF review Zivick and Lawrence


40 min Science Traceability Matrix --- [Identification of open issues[1]]. Knox, Holder, Lawrence

              Work and assignments.   Who will do what, by when?
            

10 min Baseline design simulations Zonca and Keskitalo


30 min Back to STM Knox, Holder

Notes