Difference between revisions of "LBNL-2020: S2M Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
(Add charge)
Line 12: Line 12:
  
 
== Agenda ==
 
== Agenda ==
 +
 +
30 min    Roles of and relationships between STM, error budgets, requirements                              Lawrence
 +
 +
          STM = https://docs.google.com/spreadsheets/d/1W7NWxVfKel13Vs_3_rq0rwxlOwhzItrL/edit#gid=365126799
 +
          Error budget = ???
 +
          Outline of requirements document =
 +
                  https://docs.google.com/spreadsheets/d/1EE25NskNqN5B7pOK0IPGbLkZopcRuhLDwssE1r56pkQ/edit#gid=0   
 +
 +
10 min    Success criteria for NSF review                                                                  Zivick and Lawrence
 +
             
 +
                   
 +
40 min    Science Traceability Matrix --- Identification of open issues.                                    Knox, Holder, Lawrence                               
 +
              Work and assignments.  Who will do what, by when?
 +
           
 +
 +
10 min    Baseline design simulations                                                                      Zonca and Keskitalo
 +
 +
30 min    Back to STM                                                                                      Knox, Holder
  
 
== Notes ==
 
== Notes ==

Revision as of 01:48, 31 March 2020

Connection Details

https://lbnl.zoom.us/j/676588242

Host - Charles Lawrence

Scribe -

Charge

Discuss science requirements, their flowdown to measurements requirements, and what must be done in preparation for the August review

Agenda

30 min Roles of and relationships between STM, error budgets, requirements Lawrence

         STM = https://docs.google.com/spreadsheets/d/1W7NWxVfKel13Vs_3_rq0rwxlOwhzItrL/edit#gid=365126799
         Error budget = ???
         Outline of requirements document =
                 https://docs.google.com/spreadsheets/d/1EE25NskNqN5B7pOK0IPGbLkZopcRuhLDwssE1r56pkQ/edit#gid=0    

10 min Success criteria for NSF review Zivick and Lawrence


40 min Science Traceability Matrix --- Identification of open issues. Knox, Holder, Lawrence

              Work and assignments.   Who will do what, by when?
            

10 min Baseline design simulations Zonca and Keskitalo

30 min Back to STM Knox, Holder

Notes