Difference between revisions of "LBNL-2020: S2M Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
Line 30: Line 30:
 
              
 
              
  
(10 min)    [https://docs.google.com/presentation/d/19re09Jj1N9BZrkx8sDgI0lsM72Laqq_BAx2gkVJ8pY4/edit?usp=sharing Baseline design simulations                                                                      Zonca and Keskitalo]
+
(10 min)    [https://docs.google.com/presentation/d/19re09Jj1N9BZrkx8sDgI0lsM72Laqq_BAx2gkVJ8pY4/edit?usp=sharing Baseline design simulations                                                                      [Zonca and Keskitalo]]
 
              
 
              
  

Revision as of 00:02, 1 April 2020

Connection Details

https://lbnl.zoom.us/j/676588242

Host - Charles Lawrence

Scribes - Lloyd Knox and Gil Holder

Charge

Discuss science requirements, their flowdown to measurements requirements, and what must be done in preparation for the August review

Agenda

(30 min) Roles of and relationships between STM, error budgets, requirements File:S2M flowdown CMB-S4 04-01-2020.pdf [Lawrence]


(10 min) Success criteria for NSF review [Zivick and Lawrence]


(40 min) Science Traceability Matrix [Knox, Holder]

  • Identification of open issues[1]].
  • Work and assignments.
  • Who will do what, by when?


(10 min) Baseline design simulations [Zonca and Keskitalo]


(30 min) Back to STM [Knox, Holder]

Notes