Difference between revisions of "LBNL-2020: S2M Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
Line 19: Line 19:
 
*          Outline of requirements document = https://docs.google.com/spreadsheets/d/1EE25NskNqN5B7pOK0IPGbLkZopcRuhLDwssE1r56pkQ/edit#gid=0     
 
*          Outline of requirements document = https://docs.google.com/spreadsheets/d/1EE25NskNqN5B7pOK0IPGbLkZopcRuhLDwssE1r56pkQ/edit#gid=0     
  
10 min    Success criteria for NSF review                                                                  Zivick and Lawrence
+
 
 +
(10 min)   Success criteria for NSF review                                                                  Zivick and Lawrence
 
                
 
                
 
                      
 
                      
40 min    Science Traceability Matrix --- [Identification of open issues[https://docs.google.com/presentation/d/1wUiKZjQUbN46zP8mgMiL4Xej9qj_sNvXyCv92Hvym4E/edit#slide=id.g82b3ea2132_0_0]].                                   Knox, Holder, Lawrence                               
+
(40 min)   Science Traceability Matrix                                                                       Knox, Holder
              Work and assignments.  Who will do what, by when?
+
 
 +
* Identification of open issues[https://docs.google.com/presentation/d/1wUiKZjQUbN46zP8mgMiL4Xej9qj_sNvXyCv92Hvym4E/edit#slide=id.g82b3ea2132_0_0]].                                                                  
 +
* Work and assignments.   
 +
* Who will do what, by when?
 
              
 
              
  
10 min    [https://docs.google.com/presentation/d/19re09Jj1N9BZrkx8sDgI0lsM72Laqq_BAx2gkVJ8pY4/edit?usp=sharing Baseline design simulations                                                                      Zonca and Keskitalo]
+
(10 min)     [https://docs.google.com/presentation/d/19re09Jj1N9BZrkx8sDgI0lsM72Laqq_BAx2gkVJ8pY4/edit?usp=sharing Baseline design simulations                                                                      Zonca and Keskitalo]
 
              
 
              
  
30 min    Back to STM                                                                                      Knox, Holder
+
(30 min)     Back to STM                                                                                      Knox, Holder
  
 
== Notes ==
 
== Notes ==

Revision as of 00:00, 1 April 2020

Connection Details

https://lbnl.zoom.us/j/676588242

Host - Charles Lawrence

Scribes - Lloyd Knox and Gil Holder

Charge

Discuss science requirements, their flowdown to measurements requirements, and what must be done in preparation for the August review

Agenda

(30 min) Roles of and relationships between STM, error budgets, requirements File:S2M flowdown CMB-S4 04-01-2020.pdf Lawrence


(10 min) Success criteria for NSF review Zivick and Lawrence


(40 min) Science Traceability Matrix Knox, Holder

  • Identification of open issues[1]].
  • Work and assignments.
  • Who will do what, by when?


(10 min) Baseline design simulations Zonca and Keskitalo


(30 min) Back to STM Knox, Holder

Notes