LBNL-2020: M2T Flowdown
From CMB-S4 wiki
Jump to navigationJump to searchContents
Connection Details
https://lbnl.zoom.us/j/411685173
Host - Charles Lawrence
Scribe -
Charge
Discuss flowdown from measurement requirements to instrument and experiment requirements. Emphasis on the critical role of error budgets in setting performance requirements.
Agenda
- (10 m) Overview of flowdown efforts (Lawrence)
- (10 m) Deliverables (Zivick)
- Where do we need to be for the August NSF review?
- Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
- (10 min) Overview and Status of error budget (McMahon) slides
- (10 min) SAT Error budget overview (Bischoff)
Break (10)
- (70 min) Discussion of requirements arranged by L2
- Slides
- One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
- 5-10 minute discussion for each L2