LBNL-2020: M2T Flowdown

From CMB-S4 wiki
Revision as of 16:51, 25 March 2020 by Jeff (talk | contribs) (→‎Agenda)
Jump to navigationJump to search

Charge

Agenda

  • (10 m) Overview of flowdown efforts (Lawrence)
  • (10 m) Deliverables (Zivick)
    • Where do we need to be for the August NSF review?
    • Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
  • (10 min) Overview and Status of error budget (McMahon)
  • (10 min) SAT Error budget overview

Break (10)

  • (70 min) Discussion for each L2 of what requirements they need.
    • One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
    • 5-10 minute discussion for each L2

Notes