Difference between revisions of "LBNL-2020: M2T Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
Line 10: Line 10:
  
 
Discuss flowdown from measurement requirements to instrument and experiment requirements.  Emphasis on the critical role of error budgets in setting performance requirements, and an overview of the structure of requirements.
 
Discuss flowdown from measurement requirements to instrument and experiment requirements.  Emphasis on the critical role of error budgets in setting performance requirements, and an overview of the structure of requirements.
 +
 +
Two take-away assignments for L2 leaders and teams:
 +
 +
* What is missing from the error budgets in your area?
 +
 +
* What analysis and simulation capabilities do we need but do not yet have that connect the elements of the error budget?
  
 
== Agenda ==
 
== Agenda ==

Revision as of 15:30, 31 March 2020

Connection Details

https://lbnl.zoom.us/j/411685173

Host - Charles Lawrence

Scribe -

Charge

Discuss flowdown from measurement requirements to instrument and experiment requirements. Emphasis on the critical role of error budgets in setting performance requirements, and an overview of the structure of requirements.

Two take-away assignments for L2 leaders and teams:

  • What is missing from the error budgets in your area?
  • What analysis and simulation capabilities do we need but do not yet have that connect the elements of the error budget?

Agenda

  • (20 m) Overview of flowdown efforts (Lawrence)
  • (10 m) success criteria (Zivick)
    • Where do we need to be for the August NSF review?
    • Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
  • (20 min) Overview and Status of error budget (McMahon) slides
  • (20 min) SAT Error budget overview (Bischoff)
  • (one slide) Homework

Notes