Difference between revisions of "LBNL-2020: M2T Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
Line 15: Line 15:
  
 
* (10 m) Overview of flowdown efforts (Lawrence)  
 
* (10 m) Overview of flowdown efforts (Lawrence)  
* (10 m) Deliverables (Zivick)
+
* (10 m) success criteria (Zivick)
 
** Where do we need to be for the August NSF review?   
 
** Where do we need to be for the August NSF review?   
 
**  Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
 
**  Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?

Revision as of 13:47, 31 March 2020

Connection Details

https://lbnl.zoom.us/j/411685173

Host - Charles Lawrence

Scribe -

Charge

Discuss flowdown from measurement requirements to instrument and experiment requirements. Emphasis on the critical role of error budgets in setting performance requirements, and an overview of the structure of requirements.

Agenda

  • (10 m) Overview of flowdown efforts (Lawrence)
  • (10 m) success criteria (Zivick)
    • Where do we need to be for the August NSF review?
    • Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
  • (20 min) Overview and Status of error budget (McMahon) slides
  • (20 min) SAT Error budget overview (Bischoff)


Break (10)

  • (60 min) Discussion of requirements arranged by L2
    • Slides
    • One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
    • 5-10 minute discussion for each L2

Notes