Difference between revisions of "LBNL-2020: M2T Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
Line 19: Line 19:
 
**  Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
 
**  Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
  
* (10 min) Overview and Status of error budget (McMahon)
+
* (10 min) Overview and Status of error budget (McMahon) [https://docs.google.com/presentation/d/1EUjst_T5q8SUH0UCvIhwT9tXIYOpHwgICDWxW9hddOg/edit?usp=sharing slides]
  
 
* (10 min) SAT Error budget overview (Bischoff)
 
* (10 min) SAT Error budget overview (Bischoff)

Revision as of 03:45, 31 March 2020

Connection Details

https://lbnl.zoom.us/j/411685173

Host - Charles Lawrence

Scribe -

Charge

Discuss flowdown from measurement requirements to instrument and experiment requirements. Emphasis on the critical role of error budgets in setting performance requirements.

Agenda

  • (10 m) Overview of flowdown efforts (Lawrence)
  • (10 m) Deliverables (Zivick)
    • Where do we need to be for the August NSF review?
    • Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews?
  • (10 min) Overview and Status of error budget (McMahon) slides
  • (10 min) SAT Error budget overview (Bischoff)

Break (10)

  • (70 min) Discussion of requirements arranged by L2
    • Slides
    • One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
    • 5-10 minute discussion for each L2

Notes