Difference between revisions of "LBNL-2020: M2T Flowdown"

From CMB-S4 wiki
Jump to navigationJump to search
Line 5: Line 5:
  
 
   
 
   
* (5 m) Where do we need to be for the August NSF review?
+
* (5 m) Where do we need to be for the August NSF review? (Zivick)
 
** One slide of bullets with excerpts from NSF guidance (I can provide this)
 
** One slide of bullets with excerpts from NSF guidance (I can provide this)
 
** One slide of bullets with excerpts from CME/ATLAS CDR panel charge
 
** One slide of bullets with excerpts from CME/ATLAS CDR panel charge
 
** A list of documentation we need to produce. (presentations do not count). Real draft documents, can reference my template.
 
** A list of documentation we need to produce. (presentations do not count). Real draft documents, can reference my template.
 +
 
* (5 min) Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews? Similar to 1. I can provide inputs for NSF PDR, someone else needs to speak to DOE CD-1.
 
* (5 min) Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews? Similar to 1. I can provide inputs for NSF PDR, someone else needs to speak to DOE CD-1.
 +
 
* (10 min) Overview of error budget (as envisioned, as exists)
 
* (10 min) Overview of error budget (as envisioned, as exists)
 
** Discussion of gaps and plans to fill.
 
** Discussion of gaps and plans to fill.
 
** Volunteers. Assignments. Due dates.
 
** Volunteers. Assignments. Due dates.
 +
 
* (10 min) SAT Error budget overview
 
* (10 min) SAT Error budget overview
 
   
 
   
 
Break (10 minutes, will turn into 15)
 
Break (10 minutes, will turn into 15)
 
   
 
   
* (75 min) Discussion for each L2 of what requirements they need. One slide for each with some known requirements to elicit discussion of what is missing. 10 slides (1 for each L2, 5-10 minute discussion for each)
+
* (75 min) Discussion for each L2 of what requirements they need.  
 +
** One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.  
 +
** 5-10 minute discussion for each L2
  
 
== Notes ==
 
== Notes ==

Revision as of 13:12, 25 March 2020

Charge

Agenda

  • (5 m) Where do we need to be for the August NSF review? (Zivick)
    • One slide of bullets with excerpts from NSF guidance (I can provide this)
    • One slide of bullets with excerpts from CME/ATLAS CDR panel charge
    • A list of documentation we need to produce. (presentations do not count). Real draft documents, can reference my template.
  • (5 min) Where do we need to be for the Spring 2021 DOE CD-1 and NSF PDR reviews? Similar to 1. I can provide inputs for NSF PDR, someone else needs to speak to DOE CD-1.
  • (10 min) Overview of error budget (as envisioned, as exists)
    • Discussion of gaps and plans to fill.
    • Volunteers. Assignments. Due dates.
  • (10 min) SAT Error budget overview

Break (10 minutes, will turn into 15)

  • (75 min) Discussion for each L2 of what requirements they need.
    • One (or at most a few) slide for each with some known requirements to elicit discussion of what is missing.
    • 5-10 minute discussion for each L2

Notes