Difference between revisions of "LBNL-2020: Low-ell BB"
From CMB-S4 wiki
Jump to navigationJump to search (→Charge) |
(→Charge) |
||
Line 3: | Line 3: | ||
* Present results from or statuses of data challenge 6 with real delensing incorporated | * Present results from or statuses of data challenge 6 with real delensing incorporated | ||
* Foreground models / sims | * Foreground models / sims | ||
− | + | ** Impact of foregrounds on delensing. | |
− | + | ** Foregrounds at low-ell | |
* Sketch path(s) forward for data challenges: | * Sketch path(s) forward for data challenges: | ||
− | + | ** What questions need answering by the summer’s agency review that need results from data challenges? | |
* Outline trade studies that need to be done (or present results of trade studies) for the delensing LAT | * Outline trade studies that need to be done (or present results of trade studies) for the delensing LAT | ||
− | + | ** Sensitivity vs resolution | |
− | + | ** Frequency allocation | |
* Outline trade studies that need to be done (or present results of trade studies) for SATs | * Outline trade studies that need to be done (or present results of trade studies) for SATs | ||
− | + | ** Do we need 20GHz? | |
== Agenda == | == Agenda == | ||
== Notes == | == Notes == |
Revision as of 15:22, 20 March 2020
Charge
- Present results from or statuses of data challenge 6 with real delensing incorporated
- Foreground models / sims
- Impact of foregrounds on delensing.
- Foregrounds at low-ell
- Sketch path(s) forward for data challenges:
- What questions need answering by the summer’s agency review that need results from data challenges?
- Outline trade studies that need to be done (or present results of trade studies) for the delensing LAT
- Sensitivity vs resolution
- Frequency allocation
- Outline trade studies that need to be done (or present results of trade studies) for SATs
- Do we need 20GHz?