Charge

  • Organizers to consult with relevant L2s and SEs
  • Present progress towards readout technology recommendation, or decision, or status thereof
  • Present progress towards optical coupling technology decision, or status thereof
  • Present prototype design, and fabrication and testing plan (S4 wafers tested by end of 2020)
  • Summarize/update technical risks, R&D / simulation needs to retire those risks
  • Define interfaces between Detectors, Readout, and Modules. (Who provides non-detector coupling wafers? Who bonds? How are fab resources allocated between squids and detectors? Etc etc)
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Notes