Difference between revisions of "LBNL-2020: Detectors Readout Modules"

From CMB-S4 wiki
Jump to navigationJump to search
(Created page with "== Charge == == Agenda == == Notes ==")
 
Line 1: Line 1:
 
== Charge ==
 
== Charge ==
 +
 +
* Organizers to consult with relevant L2s and SEs
 +
* Present progress towards readout technology recommendation, or decision, or status thereof
 +
* Present progress towards optical coupling technology decision, or status thereof
 +
* Present prototype design, and fabrication and testing plan (S4 wafers tested by end of 2020)
 +
* Summarize/update technical risks, R&D / simulation needs to retire those risks
 +
* Define interfaces between Detectors, Readout, and Modules.  (Who provides non-detector coupling wafers?  Who bonds?  How are fab resources allocated between squids and detectors?  Etc etc)
 +
* Plan schedule of design reviews for these subsystems needed before CD1
  
 
== Agenda ==
 
== Agenda ==
  
 
== Notes ==
 
== Notes ==

Revision as of 15:37, 19 March 2020

Charge

  • Organizers to consult with relevant L2s and SEs
  • Present progress towards readout technology recommendation, or decision, or status thereof
  • Present progress towards optical coupling technology decision, or status thereof
  • Present prototype design, and fabrication and testing plan (S4 wafers tested by end of 2020)
  • Summarize/update technical risks, R&D / simulation needs to retire those risks
  • Define interfaces between Detectors, Readout, and Modules. (Who provides non-detector coupling wafers? Who bonds? How are fab resources allocated between squids and detectors? Etc etc)
  • Plan schedule of design reviews for these subsystems needed before CD1

Agenda

Notes