* Progress towards optical coupling technology recommendation or decision | * Progress towards optical coupling technology recommendation or decision | ||
− | ** Summary of optical assessment and comments (TBC: Mark R., | + | ** Summary of optical assessment and comments (TBC: Mark R., 20-min) |
− | ** Discussion of next milestones, steps, and schedule (TBC: | + | ** Discussion of next milestones, steps, and schedule (TBC: Toki Suzuki representing L2s, 20-min) |
* Progress on determining detector specifications and flowdown (TBC: Jeff McMahon / John Ruhl, 20-min) | * Progress on determining detector specifications and flowdown (TBC: Jeff McMahon / John Ruhl, 20-min) | ||
* CDFG overview of status, plans, next steps (TBC: Mark R., 20-min) | * CDFG overview of status, plans, next steps (TBC: Mark R., 20-min) | ||
− | ** Detector wafer specifications, interfaces, and module design (TBC: | + | ** Detector wafer specifications, interfaces, and module design (TBC: Adam Anderson, 20-min) |
− | + | * Design review schedule and development goals for August agency review and CD-1 (TBC: Clarence Chang representing L2s, 20-min) | |
− | * | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
'''Parallel session 2 (11am-130pm)''' | '''Parallel session 2 (11am-130pm)''' |
Revision as of 22:17, 23 March 2020
Charge
- Organizers to consult with relevant L2s and SEs
- Present progress towards readout technology recommendation, or decision, or status thereof
- Present progress towards optical coupling technology decision, or status thereof
- Present prototype design, and fabrication and testing plan (S4 wafers tested by end of 2020)
- Summarize/update technical risks, R&D / simulation needs to retire those risks
- Define interfaces between Detectors, Readout, and Modules. (Who provides non-detector coupling wafers? Who bonds? How are fab resources allocated between squids and detectors? Etc etc)
- Plan schedule of design reviews for these subsystems needed before CD1
Agenda
Parallel session 1 (9am-11am)
TBC = To-be Confirmed
- Progress towards optical coupling technology recommendation or decision
- Summary of optical assessment and comments (TBC: Mark R., 20-min)
- Discussion of next milestones, steps, and schedule (TBC: Toki Suzuki representing L2s, 20-min)
- Progress on determining detector specifications and flowdown (TBC: Jeff McMahon / John Ruhl, 20-min)
- CDFG overview of status, plans, next steps (TBC: Mark R., 20-min)
- Detector wafer specifications, interfaces, and module design (TBC: Adam Anderson, 20-min)
- Design review schedule and development goals for August agency review and CD-1 (TBC: Clarence Chang representing L2s, 20-min)
Parallel session 2 (11am-130pm)
- Progress towards readout technology recommendation or decision (30 or 45-min?)
- Summary of readout assessment and comments (Amy or Zeesh)
- Discussion of next milestones and steps in process (Amy or Zeesh)
- Down-select metrics
- Systems engineering and interfaces (15 or 20 min?)
- Progress on determine readout specifications and flowdown (15 or 30-min?)
- Readout-related detector testing needs (30-min) - (Adam)
- Module and readout related testing needs for detector testing
- Discuss overall landscape, and what makes sense given status of readout downselect, and what resources are available
- Summary and discussion