LBNL-2020: DM
From CMB-S4 wiki
Jump to navigationJump to searchContents
Connection Details
https://lbnl.zoom.us/j/134985614
Monitor - Julian Borrill
Scribe - Tom Crawford
Charge
- Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review via a fully fleshed out WBS with milestones with FTE estimates.
- Prepare for the baseline design simulations.
- Plan the schedule of design reviews needed before CD1.
Agenda
- Overview
- WBS Level 3 scope, milestones, labor & risk
- 1.09.05 Data Reduction
- 1.09.06 Transients/Sources
- 1.09.04 Data Synthesis
- 1.09.03 Software Infrastructure
- 1.09.02 Data Movement
- 1.09.07 Site Hardware
- 1.09.01 Subsystem Management
- Baseline design simulation tool
- Subsystem design review schedule
- General discussion
Notes
Real-time notes on this google doc; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.