Difference between revisions of "LBNL-2020: DM"

From CMB-S4 wiki
Jump to navigationJump to search
Line 9: Line 9:
 
== Charge ==
 
== Charge ==
  
# Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review via a fully fleshed out WBS with milestones with FTE estimates.
+
# Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review.
 
# Prepare for the baseline design simulations.
 
# Prepare for the baseline design simulations.
 
# Plan the schedule of design reviews needed before CD1.
 
# Plan the schedule of design reviews needed before CD1.

Revision as of 09:03, 20 March 2020

Connection Details

https://lbnl.zoom.us/j/134985614

Monitor - Julian Borrill

Scribe - Tom Crawford

Charge

  1. Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review.
  2. Prepare for the baseline design simulations.
  3. Plan the schedule of design reviews needed before CD1.

Agenda

  • Overview
  • WBS Level 3 scope, milestones, labor & risk
    • 1.09.05 Data Reduction
    • 1.09.06 Transients/Sources
    • 1.09.04 Data Synthesis
    • 1.09.03 Software Infrastructure
    • 1.09.02 Data Movement
    • 1.09.07 Site Hardware
    • 1.09.01 Subsystem Management
  • Baseline design simulation tool
  • Subsystem design review schedule
  • General discussion

Notes

Real-time notes on this google doc; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.