Difference between revisions of "LBNL-2020: DM"

From CMB-S4 wiki
Jump to navigationJump to search
Line 8: Line 8:
  
 
== Charge ==
 
== Charge ==
 +
 +
# Refine the overall schedule, cost & risk assessment for the summer review via a fully fleshed out WBS with milestones with FTE estimates
 +
# Prepare for baseline design simulations
 +
# Plan the schedule of design reviews needed before CD1
  
 
== Agenda ==
 
== Agenda ==

Revision as of 11:04, 19 March 2020

Connection Details

https://lbnl.zoom.us/j/134985614

Monitor - Julian Borrill

Scribe - Tom Crawford

Charge

  1. Refine the overall schedule, cost & risk assessment for the summer review via a fully fleshed out WBS with milestones with FTE estimates
  2. Prepare for baseline design simulations
  3. Plan the schedule of design reviews needed before CD1

Agenda

Notes

Real-time notes on this google doc; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.