Difference between revisions of "LBNL-2020: DM"
From CMB-S4 wiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Connection Details == | == Connection Details == | ||
− | https://lbnl.zoom.us/j/ | + | https://lbnl.zoom.us/j/293196949 |
[https://docs.google.com/presentation/d/1Mkx9oS-xJIqIKvfMVLf1EOVto_Gdvw_3GfOd0tcDuCo slides] | [https://docs.google.com/presentation/d/1Mkx9oS-xJIqIKvfMVLf1EOVto_Gdvw_3GfOd0tcDuCo slides] |
Latest revision as of 12:32, 31 March 2020
Contents
Connection Details
https://lbnl.zoom.us/j/293196949
Monitor - Julian Borrill
Scribe - Tom Crawford
Charge
- Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review.
- Prepare for the baseline design simulations.
- Plan the schedule of design reviews needed before CD1.
Agenda
- Overview (5 min)
- WBS Level 3 scope, milestones, labor & risk (5 min)
- 1.09.05 Data Reduction (10 min)
- 1.09.06 Transients/Sources (10 min)
- 1.09.04 Data Synthesis (10 min)
- 1.09.03 Software Infrastructure (10 min)
- 1.09.02 Data Movement (10 min)
- 1.09.07 Site Hardware (10 min)
- 1.09.01 Subsystem Management (10 min)
- Baseline design simulation tool (10 min)
- Subsystem design review schedule (10 min)
- General discussion (10 min)
Notes
Real-time notes on this google doc; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.