== Charge ==
 
== Charge ==
  
# Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review via a fully fleshed out WBS with milestones with FTE estimates.
+
# Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review.
 
# Prepare for the baseline design simulations.
 
# Prepare for the baseline design simulations.
 
# Plan the schedule of design reviews needed before CD1.
 
# Plan the schedule of design reviews needed before CD1.
Line 15: Line 17:
 
== Agenda ==
 
== Agenda ==
  
* Introduction
+
* Overview (5 min)
* WBS Level 3 scope, milestones, labor & risk
+
* WBS Level 3 scope, milestones, labor & risk (5 min)
** 1.09.05 Data Reduction
+
** 1.09.05 Data Reduction (10 min)
** 1.09.06 Transients/Sources
+
** 1.09.06 Transients/Sources (10 min)
** 1.09.04 Data Synthesis
+
** 1.09.04 Data Synthesis (10 min)
** 1.09.03 Software Infrastructure
+
** 1.09.03 Software Infrastructure (10 min)
** 1.09.02 Data Movement
+
** 1.09.02 Data Movement (10 min)
** 1.09.07 Site Hardware
+
** 1.09.07 Site Hardware (10 min)
** 1.09.01 Subsystem Management
+
** 1.09.01 Subsystem Management (10 min)
* Baseline design simulation tool
+
* Baseline design simulation tool (10 min)
* Subsystem design review schedule
+
* Subsystem design review schedule (10 min)
* General discussion
+
* General discussion (10 min)
  
 
== Notes ==
 
== Notes ==
  
 
Real-time notes on [https://docs.google.com/document/d/1QQyjVULs7fbxL2WH4uALhPQCrzReO7PbErpnTCoLQPo this google doc]; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.
 
Real-time notes on [https://docs.google.com/document/d/1QQyjVULs7fbxL2WH4uALhPQCrzReO7PbErpnTCoLQPo this google doc]; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.

Latest revision as of 11:32, 31 March 2020

Connection Details

https://lbnl.zoom.us/j/293196949

slides

Monitor - Julian Borrill

Scribe - Tom Crawford

Charge

  1. Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review.
  2. Prepare for the baseline design simulations.
  3. Plan the schedule of design reviews needed before CD1.

Agenda

  • Overview (5 min)
  • WBS Level 3 scope, milestones, labor & risk (5 min)
    • 1.09.05 Data Reduction (10 min)
    • 1.09.06 Transients/Sources (10 min)
    • 1.09.04 Data Synthesis (10 min)
    • 1.09.03 Software Infrastructure (10 min)
    • 1.09.02 Data Movement (10 min)
    • 1.09.07 Site Hardware (10 min)
    • 1.09.01 Subsystem Management (10 min)
  • Baseline design simulation tool (10 min)
  • Subsystem design review schedule (10 min)
  • General discussion (10 min)