== Charge ==
 
== Charge ==
  
# Refine the overall schedule, cost & risk assessment for the summer review via a fully fleshed out WBS with milestones with FTE estimates
+
# Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review via a fully fleshed out WBS with milestones with FTE estimates.
# Prepare for baseline design simulations
+
# Prepare for the baseline design simulations.
# Plan the schedule of design reviews needed before CD1
+
# Plan the schedule of design reviews needed before CD1.
  
 
== Agenda ==
 
== Agenda ==

Revision as of 07:53, 20 March 2020

Connection Details

https://lbnl.zoom.us/j/134985614

Monitor - Julian Borrill

Scribe - Tom Crawford

Charge

  1. Define the overall scope, schedule, cost & risk of the data management subsystem for the summer review via a fully fleshed out WBS with milestones with FTE estimates.
  2. Prepare for the baseline design simulations.
  3. Plan the schedule of design reviews needed before CD1.

Agenda

Notes

Real-time notes on this google doc; please identify your notes with your initials to help with any clarifications when we transfer them to the wiki after the session.