Difference between revisions of "DAQ Telecons"
From CMB-S4 wiki
Jump to navigationJump to searchNwhitehorn (talk | contribs) (New Zoom line) |
|||
Line 19: | Line 19: | ||
== Upcoming Call == | == Upcoming Call == | ||
− | October | + | October 29, 2020 |
* Control-system trade study reports | * Control-system trade study reports | ||
+ | * ([[Media:CD_ocs_10.29.20.pdf|Some OCS Testing]]) (Cosmin) | ||
* Cross-L2 Interface planning (ambassador appointments?) | * Cross-L2 Interface planning (ambassador appointments?) | ||
Revision as of 13:55, 29 October 2020
Telecon Coordinates
2:00 PM CDT (12:00 PM PDT, 3:00 PM EDT, 7:00 PM UTC, 8 AM Friday NZST)
Web: https://msu.zoom.us/j/96625841209
Meeting ID: 966 2584 1209 Passcode: 157664
Dial-in:
- US (312) 626-6799
- Australia (03) 7018-2005
- Canada (204) 272-7920
- New Zealand 03-659-0603
- SIP 96625841209@zoomcrc.com
Minutes are circulated by email.
Upcoming Call
October 29, 2020
- Control-system trade study reports
* (Some OCS Testing) (Cosmin)
- Cross-L2 Interface planning (ambassador appointments?)
Previous Calls
September 17, 2020
- Control-system trade study reports
- PBD Report
September 3, 2020
- Check-in on Control/OCS trade study (All)
July 23, 2020
- Path forward for Control/OCS trade study (evaluation of various systems) - Discussion
- Director's review debrief (Laura/Nathan)
June 11, 2020
- Interfaces with other subsystems
- Readout [1]
- Telescope Control
- Data Management
- Summer work plan
- NB: FIRST CALL IN NOON PACIFIC SLOT
June 4, 2020
- OCS discussion, results of non-SO OCS testing
- Planning for TDM readout
- Summer work plans for group
- SUBSEQUENT TELECONS (not this one): at 2 PM central/noon pacific on Thursdays
April 23, 2020
- SO Timing System (Brian Koopman)
- Doodle to reschedule Call
March 5, 2020
- Deployment of InfluxDB/Grafana at SPT (Anne Gambrel/Sasha Rahlin) [2]
- SO Timing System (Brian Koopman)
February 6, 2020
- WBS Update [3]
- Frequency of telecons
- Options for deliverables + schedule
- OCS Updates
- SO (Jack Lashner, postponed)
- South Pole (Sasha Rahlin, in absentia)
January 9, 2020
- WBS Overview
- 1.8.1 WG Management, Reviews, etc.
- 1.8.2 Observatory Control System
- Overarching framework
- Miscellaneous Slow DAQ
- 1.8.3 Telescope Systems (LAT+SAT)
- Telescope control (pointing, etc.)
- Encoder/structure DAQ for pointing reconstruction
- 1.8.4 Subsystem development support
- Support for in-lab and other testing
- Current Schedule and Volunteer Requests
- Major items:
- We need to be prepared for readout downselect and having a working DAQ early
- Need to start an S4-specific OCS effort for lab equipment
- Timing system downselect needs someone to lead the charge
- Major items:
- Feedback from December Review
- Need more DAQ people
- Need to define what "quick-look" analysis means in detail and who is responsible for it