Difference between revisions of "DAQ Telecons"
From CMB-S4 wiki
Jump to navigationJump to searchNwhitehorn (talk | contribs) |
|||
Line 16: | Line 16: | ||
June 11, 2020 | June 11, 2020 | ||
* Interfaces with other subsystems | * Interfaces with other subsystems | ||
− | ** Readout | + | ** Readout [[https://docs.google.com/presentation/d/1D4P6lzsqlROVzciglJaoH4DeYK-SoAaNGqaS2Ojo1-k/edit?usp=sharing]] |
** Telescope Control | ** Telescope Control | ||
** Data Management | ** Data Management |
Revision as of 14:00, 11 June 2020
Telecon Coordinates
1:00 PM CST (12:00 PM PST, 3:00 PM EST, 7:00 PM UTC)
Dial In: +1-866-554-6782
Web: https://www.uberconference.com/room/cmbs4b
International dial-in:
- Australia (02) 84172302
- Canada (647) 694-4842
- New Zealand 09-8873488
Minutes are circulated by email.
Upcoming Call
June 11, 2020
- Interfaces with other subsystems
- Readout [[1]]
- Telescope Control
- Data Management
- Summer work plan
- NB: FIRST CALL IN NOON PACIFIC SLOT
Previous Calls
June 4, 2020
- OCS discussion, results of non-SO OCS testing
- Planning for TDM readout
- Summer work plans for group
- SUBSEQUENT TELECONS (not this one): at 2 PM central/noon pacific on Thursdays
April 23, 2020
- SO Timing System (Brian Koopman)
- Doodle to reschedule Call
March 5, 2020
- Deployment of InfluxDB/Grafana at SPT (Anne Gambrel/Sasha Rahlin) [2]
- SO Timing System (Brian Koopman)
February 6, 2020
- WBS Update [3]
- Frequency of telecons
- Options for deliverables + schedule
- OCS Updates
- SO (Jack Lashner, postponed)
- South Pole (Sasha Rahlin, in absentia)
January 9, 2020
- WBS Overview
- 1.8.1 WG Management, Reviews, etc.
- 1.8.2 Observatory Control System
- Overarching framework
- Miscellaneous Slow DAQ
- 1.8.3 Telescope Systems (LAT+SAT)
- Telescope control (pointing, etc.)
- Encoder/structure DAQ for pointing reconstruction
- 1.8.4 Subsystem development support
- Support for in-lab and other testing
- Current Schedule and Volunteer Requests
- Major items:
- We need to be prepared for readout downselect and having a working DAQ early
- Need to start an S4-specific OCS effort for lab equipment
- Timing system downselect needs someone to lead the charge
- Major items:
- Feedback from December Review
- Need more DAQ people
- Need to define what "quick-look" analysis means in detail and who is responsible for it