Difference between revisions of "Argonne-2018:P3-2"

From CMB-S4 wiki
Jump to navigationJump to search
Line 12: Line 12:
 
# Forecasting and simulation plan for Decadal input document ('''30 min''')
 
# Forecasting and simulation plan for Decadal input document ('''30 min''')
 
#* Spectral vs map vs time domain forecasting and simulation  
 
#* Spectral vs map vs time domain forecasting and simulation  
#** time-domain synthesis & reduction status [Julian Borrill] [[File:tod_s4.pdf]]
+
#** time-domain synthesis & reduction status [Julian Borrill] [[File:Tod_s4.pdf]]
 
#** some materials from Yuji ([[File:Atmosphre_simulation_by_toast_2018-03-06_chinoney.pptx.pdf]])
 
#** some materials from Yuji ([[File:Atmosphre_simulation_by_toast_2018-03-06_chinoney.pptx.pdf]])
 
#* Updates to performance-based forecasting: large vs small aperture, Atacama vs South Pole
 
#* Updates to performance-based forecasting: large vs small aperture, Atacama vs South Pole

Revision as of 10:57, 6 March 2018

Back to Argonne 2018 main page

Parallel session P3-2: Forecasting - Instrumentation / systematics for the Decadal input document (chair: C. Bischoff)

  1. Summary of forecasting to date (25 min)
  2. Forecasts for Atacama and South Pole (15 min)
  3. Systematics studies and coordination with technology development working groups [Colin Bischoff] (10 min)
  4. Forecasting and simulation plan for Decadal input document (30 min)
    • Spectral vs map vs time domain forecasting and simulation
    • Updates to performance-based forecasting: large vs small aperture, Atacama vs South Pole
    • Priorities for systematics forecasting
    • Coordination between forecasting for r, light relics, and extended science

Notes from session (Tuesday, March 6, 11:15-12:45)