Difference between revisions of "Argonne-2018:P2-1"

From CMB-S4 wiki
Jump to navigationJump to search
Line 7: Line 7:
 
[[:File:Instrumental_systematics_forecasting.pdf|Connections to forecasting]] (5 min): Colin Bischoff
 
[[:File:Instrumental_systematics_forecasting.pdf|Connections to forecasting]] (5 min): Colin Bischoff
  
[[File:20180305_S4_fmux2.pdf|cost]]Technology Comparison: Effects on statistical power and systematic effects (10 min): Adam Anderson & Shawn Henderson
+
[[File:20180305_S4_fmux2.pdf|cost]] - Technology Comparison: Effects on statistical power and systematic effects (10 min): Adam Anderson & Shawn Henderson
  
 
[[File:Readout_Cost_Schedule.pdf|cost]] - Technology Comparison: Effects on cost and construction schedule (10 min):  Hannes Hubmayr, Darcy Barron, Tyler Natoli  
 
[[File:Readout_Cost_Schedule.pdf|cost]] - Technology Comparison: Effects on cost and construction schedule (10 min):  Hannes Hubmayr, Darcy Barron, Tyler Natoli  

Revision as of 10:21, 6 March 2018

Back to Argonne 2018 main page

Parallel session P2-1: Readout (chair: A. Bender)

File:S4 readout intro.pdf (5 min): Amy Bender

Connections to forecasting (5 min): Colin Bischoff

File:20180305 S4 fmux2.pdf - Technology Comparison: Effects on statistical power and systematic effects (10 min): Adam Anderson & Shawn Henderson

File:Readout Cost Schedule.pdf - Technology Comparison: Effects on cost and construction schedule (10 min): Hannes Hubmayr, Darcy Barron, Tyler Natoli

Discussion & Formulation of Reference Design (30 min)

Notes from session (Tuesday, March 6, 09:45-10:45)