20190329 Large Telescopes Telecon

From CMB-S4 wiki
Revision as of 12:24, 29 March 2019 by Niemack (talk | contribs) (Created page with "On the call: Steve P, John R, Mike N Discussion of how to prepare for flowdown and deal with plan of having different frequency distributions between the r survey and the leg...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

On the call: Steve P, John R, Mike N

Discussion of how to prepare for flowdown and deal with plan of having different frequency distributions between the r survey and the legacy survey.

Agreement that it makes sense to remove 20 GHz optics tube from legacy survey; however, there is concern that anything we make changes to needs to also flow down through the detector array and readout costing.

Question: How are we going to converge on frequency bands?

Need to continue bringing this to the attention of ET and flowdown team. Will discuss it on DSR call this afternoon.